PT. GEOMINE BARA STUDIO

We dedicate our bussiness for client and meet challenges to the mining industry.

WHO WE ARE

is were we can help you

OUR FOCUS

 We have established and maintained an effective organizational structure within which all staff may participate in the continual improvement of our Quality Management System and ultimately the quality of service to our clients.

TEAMS

GEOMINE STUDIO is currently by engineers who have experiences in mining industries and oil and gas industry. This experience will help to give our client for achievable solutions but world standard products.

Our
Services

the cool stuff we can do for you

  • Geologic and engineering data analysis and calculations for stability analysis.
  • Rock-mass strengths and materialproperties and numerical analysis.
  • Rock mapping.
  • Identify rock-mass for each site chaacteristic.
  • Joint – filling mapping on the pit wall.
  • Groundwater identify for each exposed wall.
  • Calculate orientation of joint toward mining sequences.
  • Identify slope design toward potential structural issue.
  • Review geological model based on additional data.
  • Site characterization, geologic and rock-fabric mapping.
  • Surface and Underground Geotechnical Mapping.
  • Supervising Geotechnical drilling.
  • Including geotechnical logging and sampling.
  • Geotechnical, geomechanical, oriented-core, and geologic logging.
  • Drilling and Modelling Geotechnical Underground PT. Sumatera Copper Gold.
  • Determination of Stability in Underground Of Numerical Modelling.
  • Insitutesting determine parameter actual geomechanic parameter.
  • Field measurement for collect geomechanic evidens such angle of repose or failure.
  • Review geotechnical exploration program
  • Collecting and sample handling for geomechanic testing.
  • Determination sampling sampling method for each site characteristic.
  • Review analysis method for determine geomechanic parameter.
  • Supervising geomechanic testing result.
  • Feasibility study for open mineoperation and Review on going mine operation.
  • Provide Geotechnical parameter for slope design for pit and disposal/dump.
  • Provide parameter geohydrologic for slope design.
  • Provide criterion of water management.
  • Study for mineral optimalization. Mining engineering.
  • Environmental due diligence, audit and monitoring.
  • Create model geo-hydrologic based on piezometer hole.
  • Collecting data using piezometer hole with open hole method.
  • Supervising installation Vibrating Wire Piezometer (VWP).
  • Collecting data using Vibrating Wire Piezometer (VWP) method.
  • Modelling groundwater behaviour.
  • Provide geohydrology parameter for slope stabilities analysis.
  • Calculate water management for surface mine operation.
  • Groundwater management and control at mining site.
  • Drainage and surface management system.
  • Dewatering program.
  • Performing testing and analyzing hydrologcal information.
  • Identify Ground Geophysical program Geo-electric
  • Concept studies for open pit mine operation.
  • Peview slope stability for open pit mine.
  • Review mining sequences to keep optimalization based on site characteristic.
  • Due dilligent for investor.
  • Mining engineering
  • Geotechnical audit for surface mine operation.
  • Assisting mine owner or investor in mine engineering by provide technical information.

GEOMINE STUDIO provides a full suite of technical services related to geochemistry and acid rock drainage (ARD) such as field investigations including site characterization, drilling, monitoring well installation, water quality sampling and monitoring, laboratory testing, interpretation and prediction as well as engineering and management for contaminant control. While assessment of waste dump stability involves well established geotechnical design methods, the real difficulty arises in assessing appropriate design shear strength parameters for the waste materials and dump foundations. The key issue is the shear strength of the waste material, which includes rock fragments of a tonne or more, and is therefore not amenable to normal laboratory testing. There is also the issue of the appropriate density to use for determi- ning design shear strengths. The procedure adopted involved the use of laboratory shear strengths of the fines component of the waste couple with back analysis of existing dump performance. Individual dump heights over 120m have been successfully operated.

  • Potential Acid Forming (PAF) – Neutralization Acid Forming (NAF) calculation.
  • Acid Management to reduce mine acid
  • Review slope stability of disposal/dump
  • Develop Geotechnical parameter for disposal/dumpdesign.
  • Calculation optimum crest advance rate using Crest Advance method (CAR).
  • Construction and engineering rock drain for disposal/dump.
  • Calculate blending ration for slope stability improvement
  • Identify Ground Geophysical program Geo-electric

Consulting and engineering services are provided for all aspects of mine related surface and groundwater management. Surface water management to develop design, and carry out alternative measures in order to maintain the balance system of water management strategically relevant to the land-use change and comply with the environment and sustainability. The study is started from investigations and assessments in forecasting design flood, sump capacity, drainage system, and also settling pond, to remediate the pollution appear in a variety of dynamic geologic settings and enhance the technical solutions for groundwater, erosion and sedimentation. Define the impacts on water resources to answer questions about how technical problems are brought together and solved, and how management issues are decided among interests on hydrological resources. Our services comprise

  • Calculate surface water management to keep optimum capacity.
  • Calculate potential water flowing down into mine area.
  • Provide model for settling pond construction.
  • Management dumping for disposal/dump area.
  • Provide model ditch capacity toward rainfall intensity.
  • Calculate pump requirement plan for each site mine operation.
  • Integrated calculation method between field calculation and desk study.
  • Back analysis using comprehensive method to calibrate analysis result.
  • Study or reduce erosional surface using some method.
  • Back analysis to get material properties on the difficult material.
  • Fragmentation control on the high slope for rock drain construction.
  • Calculate stability of embankment or tailing using finite element method.
  • Provide geotechnical parameter for embankment design.
  • Provide prediction embankment stability after one period time.
  • Reduce erosional surface
  • Encapsuling tailing dump/disposal.
  • Hydrological analysis for planning and spillway design.
  • Sizing of cover dam and temporary diversion based on geohydrology study.
  • Creek diversion assessment based on hydrological risk assessment
  • Concept studies for depressurizing
    and identify type of aquifer for
    each mine site.
  • Study for depressurization operation
    including spacing, depth target,
    inclination and etc.
  • Calculation impact slope stabilization
    toward ground water level.
  • Wall control concept to keep wall stabilities.
  • Backbreak mapping to develop probability of failure for each slope.
  • Blasting monitoring
  • Develop site characteristic based on part particle velocity (PPv).
  • Cell mapping for each mine wall to determine wall quality.
  • Determine wall reliability.
  • Review impact blasting toward environment.
  • Fragmentation analysis for blasting result.
  • Optimalization blasting toward fragmentation target.
  • Review blasting method toward geotechnical issue.
  • Provide technical information for clients to choose slope
  • Make comparisson between some slope monitoring system
  • Review current slope monitoring system on surface and subsurface.
  • Provide slope monitoring parameter for each site characteristic.
  • Back analysis for establish monitoring criterion.
  • Establish geotechnical action plan for site characteristic.

Almost every aspect of the mining industry involves numerous uncertainties and risks. Understanding and properly handling uncertainty and risk are
crucial skills that can make the difference between success and failure. Slope Monitoring is very required to make sure slope stabilization. We have experiences related some slope monitoring system such as;

  • Slope stability radar.
  • Extensometer.
  • Slide minder.
  • Inclinometer.
  • Time Domain Reflectometer (TDR).
  • Hydrostatic Settlement.
  • Vibrating Wire Piezometer (VWP).
  • Blast mate.
  • Robotic Total Station (RTS).
  • Crack meter.
  • Supervising to install slope monitoring.
  • Failure study for back analysis
  • Establish failure database to establish slope behavior for site characteristic.
  • Calculate model estimation life of wall for responsive material.
  • Develop new material properties based on back analysis.
  • Reducing data based on rock-mass mapping.
  • By increasing the area available for immediate development,
  • Reducing the costs associated with the development
  • Ensuring that work undertaken will result in acceptable total and differential settlement profiles. By ensuring that work is actually implemented as intended.
  • Providing the comfort necessary for third parties wanting to buy and develop the land.
  • Review slope stability to optimization resources.
  • Due diligent with owner or clients to make comparison mine operation method.
  • Comparison effective cost to solve Project economic evaluation
  • Calculation Net Present Value (NPV)
  • Calculation Internal Rate Return (IRR)
  • Sensitivity analysis for production cost.
  • Conceptual mine closure based on best mining practice.
  • Review mine closure plan.
  • Review slope stability after mine operation – during reclamation.
  • Review mine closure method to improve further plan.
  • Waste and geochemical assessment.
  • Soil cover and reclamation.
  • Provide geotechnical parameter for land form design for mine optimization.
  • Design, build and monitoring services.
  • Cost estimation.
  • Design trial plot to determine optimum value based on specific site characterization.
  • Identify aquifer model of each site characteristic.
  • Study toward correlation groundwater level toward slope stability.
  • Calculate impact groundwater level toward slope stability.
  • Comparisons slope stabilization method with reducing overall slope.
  • Optimization study for dewatering project include spacing, target, inclination and etc.
  • Create model impact slope stabilization toward ground water level
  • Soil investigation for hauling road
  • Quality control construction hauling road
  • Soil investigation for jetty, port and pilling at the swampy or river or beach.
  • Soil investigation for any building
  • Soil investigation for bridge construction Index Properties
  • Test Engineering Properties Test Plate Bearing Test SPT
  • Test DCP (Insitu)Soil Compaction

Soil & Rock Mechanics Laboratory

To be a leading laboratory in research, education, and professional services in soil and rock mechanics.

Meet the team

Take a closer look into our amazing team

Novandri Kusuma Wardana

Managing Director

Bachelor Degre Mining Engineering
UPN “Veteran” Yogyakarta

Bachelor Degree Applied Mathematic
Yogyakarta State University

Master Degree Mining Engineering
UPN “Veteran” Yogyakarta

Bachelor and Master Degree from UPN “Veteran” Yogyakarta ( Geomechanics) has experiences in Geotechnical Engineering, Mine design and Mine operation. He learn mining industry from KPC Coal Mine, Sangatta, East Kutai, East Kalimantan. Novandri has member of International Society of Rock Mechanics since 2017, and now was concern in geotechnical activity until now.

In this capacity, Andri was responsible for strategic planning that managed long term studies and special projects of the Mining Services for Developing of Long term Production.

He is Dynamic Engineer professional with highly developed skills in Geotechnical engineering, laboratory testing monitoring water flows, hydrogeology, handling drought and well monitoring and auditing water resources systems in mining activity. Accomplished in performing data collection, evaluation and statistical analysis.

Background :

  • Bachelor  Degree S1 – Mining Engineering –  Rekayasa Pertambangan/ Geotechnical Engineer UPN “Veteran” Yogyakarta
  • Bachelor Degree S1 – Applied Mathematics UNY
  • Master Degree S2 – Mining Engineering – Geomechanics UPN “Veteran” Yogyakarta
  • More than 10 years Experience in Coal & Ore Mining Surface and Underground mine, Geotechnical and Mining Exploration.

Putri Nova Haryu Dhanti

Mine Analyst & Data Control Head

Bachelor Degree S1 Physics
Universitas Ahmad Dahlan Yogyakarta

Master Degree S2 Mining Engineering
UPN “Veteran” Yogyakarta

Putri has 7-year experiences in Geotechnical and Mine operation. He was graduated from University of Ahmad Dahlan Yogyakarta and Postgraduate from Universitas Pembangunan Nasional “Veteran” Yogyakarta majoring in Geomechanical Engineering  – Mining Engineering in 2019.

Starting his career in PT. Total Soyuren Indonesia,  and then 2019 as work Independent Consultant as Geotechnical Engineering in Mining and Civil Construction Project.  Putri was promoted to be Mine Analyst Data Control. Now, she is Join and holds in Position Mine Analyst & Data Control Head in PT. GEOMINE BARA STUDIO.

Background :

  • Bachelor  Degree S1 – Physics Universitas Ahmad Dahlan Yogyakarta
  • Master Degree S2 – Mining Engineering, UPN “Veteran” Yogyakarta
  • Professional Engineer – University of Muslim Indonesia

Veno Sholitha

Civil Engineering & Survey Head

Bachelor Degree S1 Civil Engineering 
Institut Teknologi Nasional Yogyakarta (ITNY)

Master Degree S2 Civil & Geotechnical Engineering
Gadjah Mada University

Veno has graduated Bachelor Degree in Civil Engineering, and his experience in Geotechnical Engineering, she has involved in data collection of geotechnical engineering, analyze and modelling of geotechnical engineering. She is advanced in geotechnical software such us Slide2, RS2, Geostudio and Plaxis.  She was concern in Development of Soil Mechanics and Geotechnical Engineering. Veno currently holds the position of Civil Engineering & Survey Dept. Head at in PT. GEOMINE BARA STUDIO.

  • Bachelor  Degree S1 Civil Engineering – Institut Teknologi Nasional Yogyakarta (ITNY)
  • Master Degree S2 – Civil & Geotechnical Engineering – Gadjah Mada University

Annisa Sustika Danif

Geotechnical Engineer

Bachelor  Degree S1 Geology Engineering
Diponegoro University (UNDIP)

Annisa is Graduate from Geology Engineering University of Diponegoro, Semarang. She is Engineer professional with highly developed skills in Geotechnical Engineering and Rock Mechanics. Project Experience in Geotechnical Engineering is about Slope Stability and Slope Monitoring especially in Soft Rock, Sedimentary Rock and Geological Setting in Sediment Process. Now, she is position in Geotechnical Engineering in PT. GEOMINE BARA STUDIO.

Background :

  • Bachelor  Degree S1 – Geology Engineering Diponegoro University (UNDIP)

Fikri Maulana Ikhsan

Hydrogeologist Engineer

Bachelor Degre Geology Engineering
Padjajaran University (UNPAD)

Fikri Maulana is Graduated from Geology Engineering of Padjajaran University. He is Engineer professional with highly developed skills in Geologist/Hydrogeologist Engineering Hard Rock or Mineral Exploration. Fikri has 3 years experience in mining project Surface and Underground of Mineral, In his current capacity, he has involved in data collection, analysis, and report preparation for several feasibility study reports, technical approval, drilling preparation, field activity. His Project Experience in PT. Cikondang Kancana Prima. Now, He is as Hydrogeologist Engineer in PT. GEOMINE BARA STUDIO.

Background :

  • Bachelor  Degree S1 – Geology Engineering – Padjajaran University (UNPAD)

Bella Devi Sekar Jati

Finance & Tax Accounting Head

Bachelor Degree S1 Mining Engineering
Universitas Pembangunan Nasional “Veteran” (UPN)

Master Degree S2 Management
Universitas Muhammadiyah Yogyakarta (UMY)

Bela has 4-year experiences in Mine Engineering and Cost Budgeting Mine operation. He was graduated from Universitas Pembangunan Nasional “Veteran” Yogyakarta majoring in Mining Engineering in 2017.

Starting his career in PT Geomine Bara Studio as Mine Engineer, in her capacity, she has involved data collection in feasibility study, cost benefit analysis, analysis and reporting. Until now, she is currently holds in Position of Finance & Tax Accounting Dept. Head in PT. GEOMINE BARA STUDIO

  • Bachelor  Degree S1 – Mine Engineering, Universitas Pembangunan Nasional “Veteran” Yogyakarta
  • Master Degree S2 – Management, Universitas Muhammadiyah Yogyakarta

Khairina Zahra Putri

Finance Officer

Bachelor  Degree S1 Accounting
Universitas Pembangunan Nasional “Veteran” Yogyakarta

Khairina Zahra has completed her accounting studies at UPN “Veteran” Yogyakarta. Khairina assist in gathering and analyzing data for budgeting, forecasting, and cost analysis, Help prepare basic financial statements (balance sheet, income statement, cash flow). Until now, she is currently holds Position of Finance Officer Staff in PT. GEOMINE BARA STUDIO.

  • Bachelor  Degree S1 – Accounting, Universitas Pembangunan Nasional “Veteran” Yogyakarta

Dennis Manuel Gultom

Jr. Geologist Engineer

Bachelor  Degree S1 Geology Engineering
University of Diponegoro

Enthusiastic and detail-oriented Geological Engineering graduate with strong academic background and fieldwork experience. Eager to apply geological mapping, soil and rock analysis, and geotechnical investigation skills in a professional geologist. Denies currently holds the Position of Jr. Geologist Engineer at PT. GEOMINE BARA STUDIO.

  • Bachelor  Degree S1 – Geology Engineering, University of Diponegoro
 

Clients

great companies we work with

Project Documentation

Some examples of our work

Our Contact

Contact Information

With the commitment of providing you greater flexibility and convenience, if you have a suggestion for improvement, a complaint or compliment, we are providing you ways to contact Geomine.
Palm Residence Purwomartani, Dayakan RT 05/02
Purwomartani, Kalasan, Sleman,
D.I. Yogyakarta. 55571 Indonesia
Telephone (0274) 2855249
Whatsapp +6281392666795
E-Mail info@geomine-studio.com